Ora Drive Bridge
1609-1611 Ora Drive in Perdido Bay
A weight-restricted wooden bridge was limiting access for emergency vehicles, heavy equipment and everyday residents in the neighborhood. Pennies funded the replacement of the aging, wooden Ora Drive Bridge with a modern structure using Geosynthetic Reinforced Soil – Integrated Bridge System (GRS-IBS) technology. Completed in April 2017, the project included:
Full replacement of the weight-restricted wooden bridge with a durable new structure
Use of GRS-IBS technology, a modern approach that provides a stronger, longer-lasting crossing
Construction completed in two phases to maintain neighborhood access throughout the project
A safe, reliable bridge is essential infrastructure, and this replacement ensures residents in the surrounding neighborhood have a weight-bearing crossing built to last.
For more information, visit the Escambia County project page here.

